Directorate of Health Affairs at Hurghada 2009 |
General Court of the Red Sea Governorate |
|
|
|
1. Construction of the Main and Secondary Water Network of Abgig Residential City |
|
2. Construction and Pavement of the Shooting Squares for the National Guard in the Eastern Region. |
|
3. Renewing the Water Network of Dammam City and also reasphalting its street. |
|
4. Construction of the Garage of the Water Seweage Authority in Dammam City. |
|
5. Construction of the High Water Tank and the Water Network Connection of Kateef City. |
|
6. Construction of Oyoun Administrative Building in Al Ehsaa. |
|
7. Construction and Pavement of Oyoun City Streets. |
|
8. Construction and Pavement of El Naierya Streets in the Eastern Region. |
|
9. Construction of Infra Structure and Villas of El Hezam El Thahaby Area in El Khobar City. |
|
10. Maintenance and Reasphalting of the Technical Institute’s internal streets. |
|
11. Construction of Buildings and Villas for citizens in Dammam City. |
|
12. Construction and Pavement of Sihat City Streets. |
|
13. Construction and Pavement of Al Job ail City Streets. |
|
1. Construction of the Sewage Water Network for the Cooperative Housing in Semouha Region in Alexandria. |
|
2. Constructing and Pavement of the Giza Regional Streets with a length 18.5 KM. |
|
3. Construction of Giza Paints and Chemical Industry Factory in Sixth October City in Cairo. |
|
4. Construction of Al Fayoum Regional Streets with a length of 25.8KM. |
|
5. Excavation and Earth moving of Water Pipeline in the Northern Coast with a length of 6.15 KM and width of 5.2 meters. |
|
6. Several Civil works for GUPCO SENTAFY PETROLEUM COMPANIE. |
|
7. Construction and Pavement of El Sharkia Regional Roads (EL Nasria Arab Darwish Road) with a length of 9.82 KM. |
|
|
|
FIRST: Contracts signed with TOTAL GOLF COMPANY (American Company Executing Project)
|
|
Second: Contracts Signed with Neama Golf
|
|
N.B. The above mentioned contract has been executed on hard soil in Sharm El Sheikh Mountains.
|
|
Third: Earthmoving at Holiday Inn AMFORUS Resort in Sharm El Sheikh with a volume of 79500 Cubic meter. |
|
Fourth: Regional Road for Sheraton and Intercontinental Resort Sharm EL Sheikh. |
|
Fifth: Construction and Roads Pavement of Sharm EL-Sheikh Crown Plaza Resort. |
|
Sixth: Construction and Roads pavement of Coral Bay Entrance and internal roads. |
|
Seventh: Construction and Roads pavement of internal roads of Sea Club Resort. |
|
Eight: Construction and Roads pavement of Sharm El Sheikh International Airport. |
|
Ninth: Construction and Roads pavement of Sharm El Sheikh International Airport (parking & landscape area). |
|
Tenth: Construction and Roads pavement of Delta Sharm Resort in Sharm Sheikh. |
|
Eleventh: Construction and Roads pavement of South Sinai Water Company in Sharm El Sheikh. |
|
Twelfth: Construction and pavement of External & Internal Roads of Sharm El-Sheikh International Congress centre. |
|
Thirteenth: Roads Network of Multinational Force& Observers, Sharm El Sheikh. |
|
|
|
1. Construction of Ambassador Hotel (an Extension to the Sonesta Beach Resort in Hurghada) 240 Rooms. |
|
2. Interior and finishing works for sonesta Beach Resort. |
|
3. Earthmoving works in Hurghada Marriott Hotel with a volume 114000 C.M. |
|
4. Interior and finishing works for Marriott Beach Hotel. |
|
5. Excavation and Shaping Lagoons in El Gouna Area (Movenpick and Sonesta Hotels) of volume 292500 C.M. |
|
6. Interior and finishing works for Palm Beach Resort. |
|
7. Excavation and shaping EL-Nabila Resort with a volume of 176500 C.M. |
|
8. National Society General Bank Branch Hurghada- Turn key. |